Combustion Inspection Elimination Kit
High-tech process to eliminate the requirement for combustion outages between HGP and Major Overhauls.

 

Until recently, gas turbines were manufactured with an expected operating time between overhauls of typically 8,000 hours when operating on a gas fuel. Utilizing the latest technology, plant users expect the most efficient performance levels available on the market. However, the addition of certain new or upgraded components to older equipment can bring attractive gains in terms of improved availability, improved fuel economy and increased power output.

With regard to availability, Turbine Services has introduced a programme to greatly improve the durability of combustion system components. This programme improves cost effectiveness of gas turbine operation by increasing combustion inspection intervals by up to 16,000 hours, and consequently leading to improved availability.

The Problem
Stress, wear and creep growth are very common problems with the following consequences:

  • Thermal stresses leading to cracking of critical components
  • Excessive wear due to vibration caused by the combustion dynamics
  • Creep growth in areas such as the transition piece picture frames, which leads to distortion and incorrect power distribution in the critical gas path

The Solution
By the application of thermal barrier coatings, local "hot spotting" of the parent materials is reduced, as is the thermal stress, thus preventing cracking of critical components. By applying hard-face coatings and wear resistant materials, and by reducing clearances, wear due to vibration is minimized.

The Benefits
By employing the latest technology in this way:

  • Availability is increased by reducing the number of overhauls
  • Spare parts requirements are reduced

All of which allow the power station managers to achieve their objective of increasing the overall profitability of their plant.

 


 